Construction and performance of the grouted cutoff, Rocky Reach Hydroelectric Project

Corporate Author: U.S. Army Engineer Waterways Experiment Station
Format: Book
Language:English
Published: Vicksburg, Miss.: Waterways Experiment Station, 1961
Subjects:
LEADER 00750nam a2200193 a 4500
001 779479
005 20171111231150.0
008 030613s1961 gr r f000 0 eng d
040 |a GR-KoDPT  |b gre  |e AACR2 
110 2 |a U.S. Army Engineer Waterways Experiment Station 
245 1 0 |a Construction and performance of the grouted cutoff, Rocky Reach Hydroelectric Project 
260 |a Vicksburg, Miss.:  |b Waterways Experiment Station,  |c 1961 
300 |a 149 σ. :  |b εικ. ;  |c 27 εκ. 
504 |a Βιβλιογραφία: σ. 95-98 
650 0 |a Grouting 
650 0 |a Seepage 
651 0 |a Rocky Reach Dam, Washington (State) 
710 |a U.S. Army Engineer Waterways Experiment Station 
952 |a GR-KoDPT  |b 59cc2c4f6c5ad13446fa5f51  |c 998a  |d 945l  |e TA 755  |t 1  |x m  |z Books