|
|
|
|
LEADER |
00905nam a2200241 a 4500 |
001 |
660851 |
005 |
20171111230433.0 |
008 |
090911s1977----gr gr 000 0 Eng d |
040 |
|
|
|a GR-AtNTU
|b gre
|
082 |
|
0 |
|2 22
|a 697.0028 BLO
|
100 |
1 |
|
|a Blommfield, D.P.
|
245 |
1 |
4 |
|a The optimisation of intermittent heating /
|c D. P. Bloomfield and D. J. Fisk
|
260 |
|
|
|a Watford:
|b Building Research Establishment,
|c c1977
|
300 |
|
|
|a (43-49) p. :
|b tables, plans ;
|c 30 cm.
|
490 |
0 |
|
|a Building Research Establishment Current Paper ;
|v CP14/77
|
500 |
|
|
|a Reprinted 1977.
|
504 |
|
|
|a Includes bibliographical references and appendix.
|
650 |
|
0 |
|a Heating
|x Control
|
650 |
|
0 |
|a Buildings
|x Environmental engineering
|
650 |
|
0 |
|a Building
|x Technological innovations
|
700 |
1 |
|
|a Fisk, D.J.
|
710 |
0 |
|
|a Building Research Station
|
952 |
|
|
|a GR-AtNTU
|b 59cc1c5a6c5ad13446f7c642
|c 998a
|d 945l
|e 697.0028 BLO
|t 1
|x m
|z Books
|