Construction scheduling with Primavera Project planner/

Main Author: Feigenbaum, Leslie
Corporate Author: Prentice Hall
Format: Book
Language:English
Published: Upper Saddle River, NJ: Prentice Hall, c2002
Edition:2η έκδ.
Subjects:
LEADER 00872nam a2200229 a 4500
001 1996914
005 20171111235938.0
008 050202s2002 gr r 000 0 eng d
020 |a 0130922013 
040 |a EAP  |b gre  |e AACR2 
082 0 |2 21  |a 690.068 
100 1 0 |a Feigenbaum, Leslie 
245 1 0 |a Construction scheduling with Primavera Project planner/  |c Leslie Feigenbaum 
250 1 0 |a 2η έκδ. 
260 1 0 |a Upper Saddle River, NJ:  |b Prentice Hall,  |c c2002 
300 1 0 |a xii, 340 σ. :  |b εικ. ;  |c 29 εκ. 
650 1 0 |a Building  |x Superintendence 
650 1 0 |a Production scheduling 
650 1 7 |a Αρχές οργάνωσης και διοίκησης έργων  |x ΔΧΤ 50 
710 1 7 |a Prentice Hall 
952 |a CY-NiOUC  |b 5a0429a66c5ad14ac1e7ff76  |c 998a  |d 945l  |e TH438.4.F45 2002  |t 1  |x m  |z Books 
952 |a GR-PaHOU  |b 59cc75896c5ad13446fb7abf  |c 998a  |d 945l  |e 690.068 FEI  |t 2  |x m  |z Books